Mumbai: Megablock on monorail for 48 hours due to maintenance
Updated On: 24 March, 2024 06:48 AM IST | A Correspondent
Services from Wadala to Chembur will resume on Sunday after 8 pm till last train
Representation Pic
Owing to maintenance work, monorail services from Wadala Depot Station to Chembur Station will be suspended on Sunday. These services will resume after 8 pm till the final train, with hour-long intervals.
Services from Wadala Depot Station to Sant Gadge Maharaj Chowk Station will remain operational, with a headway of 18 minutes. A total of 114 monorail services will be available on Sunday.
Services from Wadala Depot Station to Chembur Station will be operational with a headway of one hour on Monday, while services that extend between Wadala Depot Station and Gadge Maharaj Chowk Station will operate with the headway of 18 minutes on the same day.
As a result, a total of 147 services will be made available on Monday. Regular operations will be slowly restored as per the original schedule following the completion of maintenance works.
ADVERTISEMENT
Poll
Who will win the Punjab Elections?
114
No of monorail services operational on March 24
Tags
Trending Stories
Latest Web Stories
Latest Photos
06 August, 2026 08:34 PM IST | In Photos: Hiroshima Day Silent Peace March 2026
Preshit Deorukhkar
17 December, 2025 11:56 AM IST | IN PHOTOS: MLAs at Vidhan Bhavan during Maharashtra Legislative Council polls
Asif Ali Sayed
09 September, 2024 09:32 PM IST | IN PHOTOS: People in Mumbai celebrate Gauri Puja during Ganeshotsav
Asif Ali Sayed
09 September, 2024 09:13 PM IST | IN PHOTOS: Mumbai witnesses sunny weather as rains take a break
Asif Ali Sayed
Latest Videos
ADVERTISEMENT
Mid-day Fast
Latest Headlines
12 August, 2026 07:33 PM IST | Oshin Fernandes
10 August, 2026 07:17 PM IST | Test Tushar
10 August, 2026 11:49 AM IST | Makepeace Sitlhou
06 August, 2026 08:34 PM IST | Preshit Deorukhkar